top of page
Final Exterior Render Angle 4.png

TURNKEY ADUs

Prefabricated ADUs

— turnkey from start to finish

Design • Permit support • Factory build • Delivery • Install

Common pain points

iconcheck.png

Long, unpredictable timelines

iconcheck.png

Scope creep and change orders

iconcheck.png

Permitting confusion and rework

iconcheck.png

Multiple contractors to coordinate

iconcheck.png

On-site disruption for months

ther fix is less chaos.png

Common pain points

iconcheck.png

Long, unpredictable timelines

iconcheck.png

Scope creep and change orders

iconcheck.png

Permitting confusion and rework

iconcheck.png

Multiple contractors to coordinate

iconcheck.png

On-site disruption for months

1

Factory-built quality

Controlled environment. Consistent workmanship. Fewer weather delays.

2

Clear scope + pricing

Simple inclusions. Transparent options. Fewer surprises.

3

Turnkey Delivery

From planning through install, we coordinate the moving parts.

1

Factory-built quality

Controlled environment. Consistent workmanship. Fewer weather delays.

2

Clear scope + pricing

Simple inclusions. Transparent options. Fewer surprises.

3

Turnkey delivery

From planning through install, we coordinate the moving parts.

Pick a Base Model. Customize Finishes. Design Your Floorplan

Popular prefabricated floor plans

2 bed 1 bath.png

Starting to $ 199,000

3.png

795 Sq.Ft.

2.png

2 Bedroom

1.png

1 Bathroom

The Brookline

The Liberty front render - Copy - Copy.png

The Liberty 

3.png

900 Sq.Ft.

2.png

2 Bedroom

1.png

2 Bathroom

Starting to $ 249,900

Pick a Base Model. Customize Finishes. Design Your Floorplan

Popular prefabricated floor plans

Exterior Render 2.png
3.png

610 Sq.Ft.

2.png

1 Bedroom

1.png

1 Bathroom

The Sterling

Starting to $ 169,900

Exterior view of a completed modular ADU by Turnkey Living

Studio

Starting to $ 119,000

A simple, repeatable process

How it works

One project, one team, one clear scope.

Why “turnkey” means

Typical phases—factory to keys-in-hand is about 3 months.

Project flow (high level)

We handle

iconcheck.png

Site evaluation + feasibility

iconcheck.png

Plan set + permit coordination

iconcheck.png

Factory build + quality checks

iconcheck.png

Delivery + install coordination

iconcheck.png

Punch list + closeout

You choose

iconcheck.png

Model + upgrades

iconcheck.png

Finish package

iconcheck.png

Appliance tier

iconcheck.png

Exterior style options

iconcheck.png

How you’ll use the space

1

Planning

Feasibility + selections

2

Permitting

City review + approvals

3

Site prep

Foundation + utilities

4

Factory build

Unit construction

5

Install

Delivery + connections

ChatGPT Image Jan 22, 2026, 04_08_05 PM.png

Install day
should be a moment,
not a season.

turnkey_adu_canva_ready.jpg

Goal: a smooth path from idea → move-in, with fewer handoffs and fewer surprises.

How it works

A simple, repeatable process

turnkey_adu_canva_ready.jpg

Goal: a smooth path from idea → move-in, with fewer handoffs and fewer surprises.

ChatGPT Image Jan 22, 2026, 02_59_49 PM.png

Why prefabricated?

Factory building turns “construction” into a controlled process.

1

Quality control

Work happens in a consistent environment with repeatable checks.

2

Fewer delays

Less exposure to weather and site constraints.

3

Cleaner job site

Shorter on-site install window and less disruption.

4

Predictability

Clear scope, defined phases, and better scheduling.

Why “turnkey” means

One project, one team, one clear scope.

We handle

iconcheck.png

Site evaluation + feasibility

iconcheck.png

Plan set + permit coordination

iconcheck.png

Factory build + quality checks

iconcheck.png

Delivery + install coordination

iconcheck.png

Punch list + closeout

You choose

iconcheck.png

Model + upgrades

iconcheck.png

Finish package

iconcheck.png

Appliance tier

iconcheck.png

Exterior style options

iconcheck.png

How you’ll use the space

Project flow (high level)

Typical phases—factory to keys-in-hand is about 3 months.

1

Planning

Feasibility + selections

2

Permitting

City review + approvals

3

Site prep

Foundation + utilities

4

Factory build

Unit construction

5

Install

Delivery + connections

ChatGPT Image Jan 22, 2026, 04_08_05 PM.png

Install day
should be a moment,
not a season.

ChatGPT Image Jan 22, 2026, 04_42_13 PM.png

Backyard rental

Add a separate unit you can rent
(subject to local rules).

Family suite

Comfortable space for parents, kids, or guests — close, but independent.

ChatGPT Image Jan 22, 2026, 04_57_28 PM.png

Family suite

ChatGPT Image Jan 22, 2026, 05_09_45 PM.png

Home office / studio

A dedicated place to work, create, train, or host clients.

What people build ADUs for

Three common outcomes — and one clear path to get there.

ChatGPT Image Jan 22, 2026, 04_42_13 PM.png

Backyard rental

Add a separate unit you can rent
(subject to local rules).

ChatGPT Image Jan 22, 2026, 04_57_28 PM.png

Family suite

Comfortable space for parents, kids, or guests — close, but independent.

ChatGPT Image Jan 22, 2026, 05_09_45 PM.png

Home office / studio

A dedicated place to work, create, train, or host clients.

The Liberty front render 1130.jpg

What people build ADUs for

Tell us your goals and we’ll map the best path from idea → move-in.

Beige Minimalist Contact Us Instagram Post (3).png

Enter Your Info to Get Your Personalized Solution

Multi Choice
bottom of page